PLANNING & ZONING APPLICATION FEES: 7/5/2006
ANNEXATION $1,200.00  + PLUS $30.00 PER ACRE OR PORTION OF
APPEALS $350
CITY ORDINANCE REVISION $800.00
COMPREHENSIVE PLAN MAP AMENDMENT $2,000.00
COMPREHENSIVE PLAN TEXT AMENDMENT $1,500.00
DESIGN REVIEW    
     SUBDIVISION LANDSCAPING REVIEW 250 +20 PER ACRE
     ARCHITECTURAL BUILDING REVIEW
             MULTI-FAMILY RESIDENTIAL $400 + $10 PER UNIT
             OFFICE, COMMERCIAL, INDUSTRIAL $400 + $10/1,000 SQ. FT.
     INSPECTION FEE
             TENANT $100.00
             LANDSCAPE $150.00
             BUILDING $150.00
             REINSPECTION $60.00
FINAL PLAT 600 + $20 / LOT
LOT LINE ADJUSTMENT $200
LOT SPLIT $200
MOBILE HOME PARK $1,270
MOVING BUILDING $30.00
PLANNED UNIT DEVELOPMENT 600 + $20 PER LOT
PLANNED UNIT DEVELOPMENT / FINAL $20 PER LOT
PRELIMINARY PLAT 1276 + 20 PER LOT
PLAT, COMBINATION (PRELIMINARY/FINAL) $1,228.00
RE-INSPECTION FEE/ P&Z $60.00
REZONE $1,100
SIGN
     MASTER SIGN PLAN $350.00
     SINGLE TENANT SIGN $250.00
     STAFF LEVEL SIGN $60.00
SPECIAL USE   $800.00
SPECIAL USE (IN-HOME DAYCARE) $330.00
STREET LIGHT INSPECTION FEE $35.00 FOR 1ST  + $20/EACH ADDITIONAL
TIME EXTENSION $100.00
VACATION $400
VARIANCE $600
WAIVER REQUEST $100.00
PLANNING & ZONING BUILDING PERMIT FEES:
BUILDING PERMIT APP FEE $30.00
BUILDING PERMIT MODIFICATION FEE $100.00
COMMERCIAL BUILDING PERMIT APP $30.00
ZONING FEE $40
RES CHECK $25.00
PRESSURIZED IRRIGATION $1,300
WATER HOOKUP   $1,270    $320.00 5/8 - 3/4" METER $1,370 2" COMPOUND METER
  $360.00 1" METER $1,865 3" COMPOUND METER
  $550.00 1 1/2" METER $1,420 4" COMPOUND METER
  $680.00 2" METER
SEWER $4,200.00
MANUFACTURED HOME FOUNDATION $78.00
MECHANICAL WITH NO FIREPLACE $38.00
MECHANICAL WITH A FIREPLACE $46.00
ENGINEERING FEES*                                                                                                                                                                                 The City does not have a full time engineer on staff. Engineering services are paid for on a "per hour" basis. Said Engineering cost shall include all costs associated with the review of the preliminary plat, final plat, and construction drawings. Time will also be billed for consultation, onsite inspection, tests, etc. The developer or person incurring these costs will be billed by the City and must be paid prior to final plat approval.
ADMINISTRATIVE FEES *
Cassette Tapes/90 minutes . . . . . . .. . $  3.50
Compact Disc . . . . . . . . . . . . . . . . . ….. .$  3.50
Copies . . . . . . . . . . . . . . . . . . . . . . . …….$   .10 per page over 10 pages 
Color Copies . . . . . . . . . . . . . . . . ….... .  $   .20 per page
Maps11 X 17 or smaller (B&W) .... . . .. $  2.00
Maps11 X 17 or smaller (Color) ... . . .. $  3.00
Maps/Large Format (over 11 X 17). .... $20.00
Neighborhood mailing lists/labels . . . $20.00
* Public Information Request may be subject to additional charges based on Idaho Code 9-338
* Plus tax